Generic cost ranges don't tell you why one bathroom renovation costs $1,800 and another costs $16,000. See two real, itemized Vancouver projects and see how a scoped estimate changes everything.

A vague range like "$15,000 to $60,000" doesn't tell you anything about your specific bathroom. RenoFiz builds a scoped, itemized estimate for every project, so instead of a guess, you get two real Vancouver projects — one small, one large — with every line item shown.
Below are two real RenoFiz estimates for Vancouver condo bathrooms: a small vanity-and-toilet swap, and a full gut renovation. They show two very different project types — and how RenoFiz builds a custom, itemized estimate around your actual scope, not a generic range.
For this Vancouver condo bathroom vanity and toilet replacement, RenoFiz estimated $1,768 CAD for the core project (range $1,400-$2,150), with up to $825 CAD in possible additional work for a toilet flange extension or drywall patch and paint if discovered after demolition.
View full estimateA full condo bathroom renovation in Vancouver with contractor-supplied materials typically costs $12,600–$19,100. This estimate covers a new tub with tiled surround, 30-inch vanity with cultured marble top, LVP flooring, new toilet, glass shower door, updated lighting, permits, and condo logistics coordination.
View full estimate| Comparison | Smaller project: Vanity & toilet replacement | Larger project: Full bathroom renovation |
|---|---|---|
| Property type | Condo with in-suite water shut-offs | Condo / Apartment (built 1990 or newer) |
| Bathroom scope | 30-inch vanity and 1 toilet replacement (condo) | Full bathroom renovation (40 sqft condo bathroom) |
| Questions asked during chat | 2 | 4 |
| Total project cost | $1,767.76 | $15,838.08 |
Typically requires strata approval, elevator booking, and building common-area protection before work starts — budget for this even on small jobs.
Required for most fixture replacements and full renovations in multi-family buildings; fees are usually carried as an allowance until confirmed.
May trigger hazardous material (asbestos) testing before demolition can begin — homes built in 1990 or later typically do not.
Significantly changes the materials portion of your estimate — owner-supplied fixtures shift more of the cost to labour.
Moving a tub, retiling a full wet wall, or adding waterproofing membranes adds cost and complexity beyond simple fixture swaps.
Our AI assistant helps you understand the work and likely cost. If you decide to connect with a contractor, they start with your project details and estimate.